A total-project management framework showing how safety, health and environment (SHE) performance in construction is determined by decisions made at every stage from concept through design, contracting, construction, commissioning and review.

A profile of this book is on the way.

Get the book →

What it’s about

Written by senior health and safety executives from Europe's leading client and constructor organizations, this European Construction Institute guide argues that construction's unacceptable safety record is not inevitable but is the predictable outcome of the whole chain of project decisions. It reframes site accidents as end-points of choices made much earlier by clients, designers, engineers and financiers, and lays out a systematic, proactive SHE management system spanning company policy, initial concept, design, cost-benefit analysis, contractual arrangements, contractor selection, planning, construction, commissioning, handover, audit and review. With checklists, worked examples (HAZCON, HAZOP, permit-to-work, method statements, SHE action plans) and stage-by-stage guidance, it equips every party in the construction process to earn superior SHE performance by applying well-established best practice consistently.

The through-line

Who it’s for
A construction project participant — client, designer, engineer, contractor or sub-contractor — who wants to deliver projects successfully while protecting people's lives and health and the environment.
The problem
The construction industry has an unacceptable safety, health and environmental record, with rising accident rates and hazards that materialise on site. Those responsible feel that accidents are inevitable, that good SHE ideas are rarely applied consistently, and that safety adds cost and conflicts with commercial pressures.
The plan
  1. Establish company SHE policy at Board level giving SHE equal status with quality and commercial goals.
  2. Identify major hazards and assess risks at initial concept (HAZCON 1) and refine as the project develops (HAZCON 2).
  3. Use design and specification to eliminate or mitigate construction hazards through systematic hazard management.
  4. Recognise and price SHE costs and benefits to close the cost expectation gap.
  5. Define contract strategy and documentation that assigns clear SHE responsibilities.
The payoff
Reduced death and injury and less environmental damage from construction. · Safe, tidy, efficient sites with high morale, fewer disputes, reduced absenteeism and better relationships. · Lower avoided costs from accidents, litigation and delays alongside improved cost, time and quality performance.